[vc_row][vc_column][vc_column_text]
Contractor Updates
May 29, 2020The new on-site Project Manager has communicated that they are continuing to work on the dirt piles, hoping to have most of it removed so crews can start cleaning up by the first week in June.The on-site Project Manager stated his priority is to move out of the Trails HOA space as quickly as possible. Reclaiming will begin after the first week in June, so crews will still be visible and in our space.May 22, 2020
- The local Project Manager is no longer with the project. New contact information will be provided as soon as possible.
- Dusty conditions concerns:
- Requested the water truck make extra passes to keep dust down. Lucas will talk to the new Project Manager.
- Extra dirt is being staged in our open space:
- Since we don't want the dirt, Lucas agreed to remove all extra dirt.
- Seeding will take place sometime between now and October. Seeds will be inserted 1 inch into the ground and then covered with top soil.
- Concern over changing the landscape thus causing additional drainage issues for neighbors on the east side.
- Lucas restated that all elevations are documented and contractually his company is required to return the landscape to those elevations.
- Lost vegetation claim - Lucas was advised that a neighbor lost a tree and that the documentation will be forwarded upon receipt. He has committed to look into it.
- The new local Project Manager is still ramping up. We will have more specific time lines to the above in a couple weeks
March 25, 2020You will be seeing loads of pipe material starting to be staged in your area beginning on Tuesday, March 31st. These loads will continue to come in for your section over the course of the next couple of weeks. I just wanted to give you a heads up in case anyone in your HOA inquires.Please help remind your HOA (the kids and the curious) to stay off the right-of-way. We will be posting signs as well.[/vc_column_text][vc_separator][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]
Construction Photos
[/vc_column_text][vc_images_carousel images="3020,3019,3029,3028,3030,3031,3032,3033,3034,3035,3036" img_size="full" slides_per_view="2" autoplay="yes" wrap="yes"][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]
Denver Water Pipeline - Proposed Construction Begins Week of March 23
Denver Water Pipeline construction on the Trails HOA property is tentatively scheduled to begin the week of March 23. The full timeline can be viewed by clicking the "The Trails HOA Pipeline Construction - Tentative Schedule" button below.Message from the Contractor: Please advise residents of The Trails neighborhood that as construction activity picks up in your area to please be mindful of the construction and to please not let children wander into the construction limits or construction work areas. We do not want anyone to get hurt. If you have any concerns or questions to be answered, please fill out the online Contact Form. We will post answers and questions on the website.Following is a list view of the construction schedule:
- Week of 3/23/20: Install Pipe Culvert at Van Bibber Creek
- Week of 3/23/20 - Week of 3/30/20: Prep ROW/Install Silt Fence
- Week of 3/23/20 - Week of 3/30/20: Strip Topsoil
- Week of 3/23/20 - Week of 4/6/20: Install Dewatering Wells For Pipe Installation
- Week of 3/30/20 - Week of 4/13/20: Receive Pipe and Pipe Bedding Materials
- Week of 3/30/20 - Week of 4/27/20: Install 66" Pipe
- Week of 4/27/20 - Week of 5/11/20: Begin Regrading
- Week of 5/11/20 - Week of 5/18/20: Seeding Restoration - Tentative
Additional Notes:* Schedule Does Not Reflect Impact or Delays Associated with Adverse Weather* Schedule does not account for any uncontrollable delays or impacts associated with COVID-19[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_btn title="The Trails HOA Pipeline Construction - Tentative Schedule" link="url:https%3A%2F%2Fthetrailshomeowners.org%2Fwp-content%2Fuploads%2F2020%2F03%2FThe-Trails-HOA-Pipeline-Construction-Tentative-Schedule.pdf||target:%20_blank|"][/vc_column][/vc_row][vc_row][vc_column][vc_btn title="Denver Water Pipeline - Proposed Construction Staging rev 3.6.19" link="url:http%3A%2F%2Fthetrailshomeowners.org%2Fwp-content%2Fuploads%2F2019%2F03%2FDenver-Water-Pipeline_Proposed-Construction-Staging-3.6.19.pdf||target:%20_blank|"][/vc_column][/vc_row]

